Nissan Leaf e+ Charging Stations in Singapore
Singapore
Explore the map
Charge with confidence
Nissan Leaf e+ Charging Stations in Singapore
Open a Nissan Leaf e+ charging map in Singapore. Filter compatible CHAdeMO and Type 2 stations, compare charge power, and plan charging stops.
The live map starts with the Nissan Leaf e+ profile selected and compatible connector filtering enabled. Search a city or choose an area to load current station records; location access is requested only after you choose My location.
| Battery reference | 59 kWh |
|---|---|
| Consumption reference | 18 kWh/100 km |
| DC peak reference | 100 kW |
| AC charging | Up to 6.6 kW |
| Connector records | CHAdeMO · Type 2 |
| Rapid-charge window | About 45 minutes under suitable conditions |
| 80% to 15% planning range | About 213 km using the reference values |
Planning values are conservative reference estimates. Charging speed, usable energy and connector access vary by model year, battery temperature, market and station. Check manufacturer information.
This is a route-planning estimate, not a certified range figure. Speed, weather, elevation, payload, tyres and battery condition can materially change real consumption.
Reported charging locations near Singapore
This server-rendered Open Charge Map snapshot found 44 matching station records within about 30 km. Snapshot date: . Confirm live status, access and connector availability before travel.
| Station | Reported address | Power | Connectors and status |
|---|---|---|---|
| DC Handal | Johor Premium Outlets (Zone E) [200kW & 320kW DC, 22kW AC] | Zone E, Johor Premium Outlets, Kulai, Johor, 81000 | 320 kW | CCS (Type 2) · Type 2 (Tethered Connector) · Operational |
| JomCharge | Toppen Shopping Centre (Yellow Zone) [200kW DC | 22kW AC] | Level P1, Yellow Zone J26 - L26, Toppen Shopping Centre, Johor Bahru, Johor, 81100 | 200 kW | CCS (Type 2) · Type 2 (Tethered Connector) · Operational |
| chargEV | AEON Mall Tebrau City [120kW DC & 22kW AC] | Basement, Pillar A38, Aeon Tebrau City Shopping Centre, Johor Bahru, Johor, 81100 | 120 kW | Type 2 (Tethered Connector) · CCS (Type 2) · Operational |
| COLUMBIA ASIA HOSPITAL - ISKANDAR PUTERI (Medical) | Persiaran Afiat, Johor Bahru | 60 kW | Type 2 (Tethered Connector) · CCS (Type 2) · Operational |
| GENTARI @ XPARK SUNWAY ISKANDAR | Jalan Medini Selatan 2 Medini Zone F, Bandar Medini Iskandar,, Johor, 79250 | 50 kW | CHAdeMO · CCS (Type 2) · Type 2 (Socket Only) · Operational |
Which chargers fit the Nissan Leaf e+?
This profile matches station records reporting CHAdeMO, Type 2. Connector hardware and adapters vary by market and model year, so confirm both the vehicle inlet and station before travel.
How is charging time estimated?
The planner uses battery size, reference consumption, starting charge, reserve and station power. Actual time changes with battery temperature, charge curve, weather and charger sharing.
Does the Nissan Leaf e+ support Plug & Charge?
Connector compatibility does not by itself confirm automatic Plug & Charge. Support can depend on model year, vehicle software, market, charging network and an active contract. Confirm it with the manufacturer and charging provider before relying on it.
How do I find EV chargers nearby?
Search for a place or choose My location, then move and zoom the map to refresh the results.
What do the charger colors mean?
Green is up to 22 kW, cyan is 22–149 kW, and purple is 150 kW or more. Multiple pins mean that one location offers connectors in several speed bands.
How do I plan an EV road trip?
Enter two places separated by “to,” such as “Paris to Berlin.” The route and nearby charging options will appear together.