BYD ATTO 3 Charging Stations in Baltimore
Baltimore
Explore the map
Charge with confidence
BYD ATTO 3 Charging Stations in Baltimore
Open a BYD ATTO 3 charging map in Baltimore. Filter compatible CCS and Type 2 stations, compare charge power, and plan charging stops.
The live map starts with the BYD ATTO 3 profile selected and compatible connector filtering enabled. Search a city or choose an area to load current station records; location access is requested only after you choose My location.
| Battery reference | 60.5 kWh |
|---|---|
| Consumption reference | 16 kWh/100 km |
| DC peak reference | 88 kW |
| AC charging | Up to 11 kW |
| Connector records | CCS · Type 2 |
| Rapid-charge window | About 44 minutes under suitable conditions |
| 80% to 15% planning range | About 246 km using the reference values |
Planning values are conservative reference estimates. Charging speed, usable energy and connector access vary by model year, battery temperature, market and station. Check manufacturer information.
This is a route-planning estimate, not a certified range figure. Speed, weather, elevation, payload, tyres and battery condition can materially change real consumption.
Reported charging locations near Baltimore
This server-rendered Open Charge Map snapshot found 26 matching station records within about 30 km. Snapshot date: . Confirm live status, access and connector availability before travel.
| Station | Reported address | Power | Connectors and status |
|---|---|---|---|
| Walmart 5228 - Columbia, MD | 6405 Dobbin Road, Columbia, MD, 21045 | 350 kW | CCS (Type 1) · Operational |
| Simon Arundel Mills Electrify America | 7000 Arundel Mills Circle, Hanover, Maryland, 21076 | 350 kW | CCS (Type 1) · Operational |
| Courtyard Marriott - Silver Spring North | 12521 Prosperity Dr, Silver Spring, MD, 20904 | 200 kW | CHAdeMO · CCS (Type 1) · Operational |
| 7Charge - Beltsville 41717 | 11350 Baltimore Ave, Beltsville, MD, 20705 | 180 kW | NACS / Tesla Supercharger · CCS (Type 1) · Operational |
| BGE - BWI Rideshare Lot | 671 Elkridge Landing Rd, Linthicum Heights, MD, 21090 | 150 kW | CHAdeMO · CCS (Type 1) · Partly Operational (Mixed) |
Which chargers fit the BYD ATTO 3?
This profile matches station records reporting CCS, Type 2. Connector hardware and adapters vary by market and model year, so confirm both the vehicle inlet and station before travel.
How is charging time estimated?
The planner uses battery size, reference consumption, starting charge, reserve and station power. Actual time changes with battery temperature, charge curve, weather and charger sharing.
Does the BYD ATTO 3 support Plug & Charge?
Connector compatibility does not by itself confirm automatic Plug & Charge. Support can depend on model year, vehicle software, market, charging network and an active contract. Confirm it with the manufacturer and charging provider before relying on it.
How do I find EV chargers nearby?
Search for a place or choose My location, then move and zoom the map to refresh the results.
What do the charger colors mean?
Green is up to 22 kW, cyan is 22–149 kW, and purple is 150 kW or more. Multiple pins mean that one location offers connectors in several speed bands.
How do I plan an EV road trip?
Enter two places separated by “to,” such as “Paris to Berlin.” The route and nearby charging options will appear together.